Lead time & shipping
Stock levels and lead times
Stock is flagged at three levels — in stock, material on hand, and made to order — with a lead time range for each. The flag moves as goods ship, so what the page shows is the current position.
| Stock level | What it means |
|---|---|
| In stock | Held on the shelf, ships as soon as the order lands |
| Material held | Raw material is in stock; the part has to be scheduled and machined |
| Made to order | Machined to your drawing, or a non-standard size |
Packing and shipping
Packing and export packaging are specified to the requirements of the destination; UN transport numbers for battery products are supplied with the shipment.